Northern Beaches Hospital Connectivity Project - NSW

Key Highlights

Construction dates: June 2015 – June 2020
Construction value: $500 million

Project details:

  • 10km of roadwork around the Northern Beaches Hospital in Frenchs Forest,
  • Design of existing road surface and major stormwater & drainage underground relocation,
  • Widening Warringah Road from 3 to 5 lanes,
  • Re-grading of Frenchs Forest & Wakehurst Parkway intersection,
  • 2x prefabricated steel pedestrian bridges,
  • 2x road bridges,
  • 2x slot roads with flyovers.
Northern Beaches Hospital Connectivity Project - NSW

Services supplied:

  • Survey Management and all survey resources including up to 11 survey teams,
  • 10km of installed, measured, and adjusted survey control to RMS specification,
  • Detail surveys for the design of existing road surface, and surveys for major stormwater & drainage underground services relocation,
  • Preservation of survey infrastructure (POSI) as per RMS G71 specifications,
  • Survey construction of the roads and bridges,
  • Monitoring of slot walls during the excavation process,
  • UAV Survey – Drone survey for shadowing of houses,
  • Final replacement of state survey marks,
  • Cadastral boundary definition markings.