Road – South Road Upgrade Darlington – SA

All

South Road Upgrade Darlington

Key Highlights

Construction Dates: June 2016 – December 2018
Construction Value: $620 million
Client:  Fulton Hogan & Laing O’Rourke (Joint Venture)

 Project Details:

  • A non-stop motorway between the Southern Expressway and Tonsley Boulevard,
  • A lowered, non-stop motorway passing underneath Flinders Drive, Sturt Road, Sutton Road/Mimosa Terrace and Tonsley Boulevard,
  • Grade separation of the Main South Road/Ayliffes Road/Shepherds Hill Road intersection,
  • Main South Road (at grade) surface roads along both sides of the lowered motorway to provide connections to Flinders Drive, Sturt Road and most local roads,
  • Full free flow interchange at the Southern Expressway/Main South Road with dedicated ramps providing direct access to the new motorway and Main South Road and
  • Upgrades to cycle and pedestrian routes.
South Road Upgrade Darlington

Services Supplied:

  • Supplementary servey resources including up to 7 surveyors/teams,
  • Terrestrial Laser Scanning monitoring of concrete structures,
  • Set-out & WAE of earthworks, services, structures and pavement.