15 Jan 2026
Building – Logan Hospital Expansion Project – QLD
Key Highlights
Construction dates: Jan 2022 – June 2024
Construction value: $470 million
Client: John Holland
Project details:
- Construction of an additional 5 levels to the existing hospital,
- Construction of additional clinical services on ground-level car parking.
Services supplied:
- Supplied two experienced Construction Surveyors to the project,
- Management of the control network, including locating existing structures to confirm tie-in positions,
- Deformation monitoring of the structure over the project duration,
- Noise, dust, and vibration monitoring will be done in real-time at various locations throughout the duration of the project.