4 Mar 2025

Road – Rockhampton Ring Road South Package 1 – QLD

All

Photo 1: Ridgelands Road roundabout as part of the Rockhampton Ring Road, South Package. Supplied by ACCIONA-Fulton Hogan Joint Venture.

Key Highlights

Construction dates: South Package 1: November 2023 –late 2025 (estimated completion date)

Construction value: $120 million

Client:ACCIONA & Fulton Hogan Joint Venture (South Package 1)

Project details:

  • Rockhampton–Ridgelands Road upgrade in West Rockhampton, including Canoona Road intersection, replacement of Lion Creek bridge, modifications to Osborne Road, and construction of the Rockhampton–Ridgelands Road/Osborne Road roundabout with a stub for future connection to the Rockhampton Ring Road.
  • Upgrade of Nine Mile Road/Rockhampton–Ridgelands Road intersection.
  • Preload of embankment between the Capricorn Highway and Abutment A of the Nelson – Dunganweate Lagoon bridge.
Photo 1: Ridgelands Road roundabout as part of the Rockhampton Ring Road, South Package. Supplied by ACCIONA-Fulton Hogan Joint Venture.

Photo 1: Ridgelands Road roundabout as part of the Rockhampton Ring Road, South Package. Supplied by ACCIONA-Fulton Hogan Joint Venture.

Services supplied:

  • Supplied 2 experienced Construction Surveyors to the project,
  •  Protection of Survey marks as part of the control network. Traverse and least square adjusted network and digitally levelled,
  • Survey management of bridges,
  • Set out and as-built Survey Infrastructure Works,
  • Concrete and pavement set-out reporting with stringless paving machines.